Forte L4-2.0L (2010)
[Dual CVVT]
7. Install timing chain tensioner arm (B).
Tightening torque :
9.8 - 11.8N.m (1.0 - 1.2kgf.m, 7.2 - 8.7lb-ft)
8. Install timing chain auto tensioner (A) and remove set pin.
Tightening torque :
9.8 - 11.8N.m (1.0 - 1.2kgf.m, 7.2 - 8.7lb-ft)
[Single CVVT]
[Dual CVVT]
9. After rotating crankshaft 2 revolutions in regular direction (clockwise viewed from front), confirm the timing mark.
10. Install timing chain cover.
(1) Using a gasket scraper, remove all the old packing material from the gasket surfaces.
(2) The sealant locations on chain cover and on counter parts (cylinder head, cylinder block, and ladder frame) must be free of engine oil and
ETC.
(3) Before assembling the timing chain cover, the liquid sealant Loctite 5900H or THREEBOND 1217H should be applied on the gap between
cylinder head and cylinder block.
The part must be assembled within 5 minutes after sealant was applied.