Rondo V6-2.7L (2009)
12. Install the timing belt upper cover(A).
Tightening torque
9.8 - 11.8Nm(1.0 - 1.2kgf.m, 7.2 - 8.7lb-ft)
13. Install the drive belt tensioner(C).
Tightening torque
34.3 - 53.9Nm(3.5 - 5.5kgf.m, 25.3 - 39.8lb-ft)
14. Install the drive belt idler and the drive belt(A).
Tightening torque
34.3 - 53.9Nm(3.5 - 5.5kgf.m, 25.3 - 39.8lb-ft)
15. Install the right side cover.
16. Install the front right wheel and tire.
17. Install the engine cover.