landrover Workshop Repair Guides

Land Rover Workshop Service and Repair Manuals

Relays and Modules - Powertrain Management > < Central Junction Box (CJB)|Page 458
Page 14
background image

^

Tighten the bolts to 25 Nm (18 ft. lbs.).

13. Install the CJB.
14. Connect the battery positive cable to the BJB.

^

Tighten the nut to 25 Nm (18 ft. lbs.).

15. Install the BJB cover.

^

Secure the clip.

16. Install the ECM.

^

Install the ECM top cover.

17. Install the ECM cover.

^

Tighten the Torx screws.

^

Connect the electrical connectors.

18. Install the auxiliary battery tray.
19. Install the battery tray.
20. Install the four-wheel drive control module.
21. Install the air cleaner assembly.
22. Install the radiator grille.
23. Install the engine cover.
24. Connect the battery ground cable.
25. Check the headlamp beam alignment.

Relays and Modules - Powertrain Management > < Central Junction Box (CJB)|Page 458