LS 400 V8-4.0L (1UZ-FE) (1990)
(a) Install the 10 high tension cords.
(b) (Ignition Coil Side) Install the cord holder to the ignition coil.
(c) Install the 5 cord clamps to the high tension cord.
(d) Install the 5 cord clamps to the lower high tension cord cover.
31. Install RH No.3 timing belt cover.
(a) Install the 3 gaskets to the timing belt cover.
(b) Install the timing belt cover with the 4 bolts.
32. Install LH No.3 timing belt cover.
(a) Install the 3 gaskets to the timing belt cover.
(b) Install the cord grommet to the high tension cord.
(c) Install the cord grommet to the timing belt cover, and install the timing belt cover with the 4 bolts.
(d) Connect the vacuum hose to the EVAP BVSV.
33. Install RH engine wire cover.
Install the wire cover with the bolt.
34. Install LH engine wire cover.