LS 400 V8-4.0L (1UZ-FE) (1990)
(a) Connect the water by-pass hose to the water inlet housing.
(b) Install the water by-pass pipe with the 2 bolts.
(c) Install the wire and connector to the water by-pass pipe.
(d) Connect the water by-pass hose (from reservoir tank) to the water by-pass pipe.
28. Install LH ignition coil.
(a) Install the ignition coil with the 2 bolts.
(b) Connect the ignition coil connector.
29. Install drive belt idler pulley.
Install the idler pulley and cover plate with the pulley bolt.
Torque: 380 kg.cm. (27 ft.lb., 37 Nm).
30. Install high tension cords.