SC 300 L6-3.0L (2JZ-GE) (1992)
7. Install camshaft timing pulleys.
(a) Align the camshaft knock pin with the groove on the pulley, and slide on the timing pulley.
(b) Using SST to hold the pulley, torque the pulley bolt. SST 09278-54012
Torque: 79 Nm (810 kgf-cm, 59 ft-lb)
8. Set No.1 cylinder to TDC/Compression.
(a) Turn the crankshaft pulley, and align its groove with timing mark "0" of the No.1 timing belt cover.
(b) Turn the camshaft, and align the timing marks of the camshaft timing pulleys and No.4 timing belt cover. SST 09278-54012
9. Install timing belt.
HINT (When re-using timing belt): Align the matchmarks of the timing belt and camshaft timing pulleys.
(a) Remove any oil or water on the camshaft timing pulley, and keep it clean.