mazda Workshop Repair Guides

Mazda Workshop Service and Repair Manuals

Clutch, M/T > < Primary Control Valve Body Removal [FS5A-EL]|Page 4689
Page 8
background image

13. Install the new control valve body cover with new seal bolts.

Tightening torque 9.8 - 15.7 Nm (100 - 160 kgf-cm, 87 - 138 inch lbs.) 

14. Apply ATF to a new O-ring and install it on the oil pipe.
15. Install the oil pipe and oil hose. 
16. Connect the lower radiator hose.
17. Add the engine coolant. 
18. Add ATF to the specified level. 
19. Install the front crossmember. 
20. Install the under cover.
21. Install the air cleaner component and air cleaner bracket. 
22. Connect the negative battery cable.
23. Perform the mechanical system test.

Clutch, M/T > < Primary Control Valve Body Removal [FS5A-EL]|Page 4689