ML 500 (163.175) V8-5.0L (113.965) (2003)
-
Screw, dashboard to transmission tunnel = 30 Nm
19
Pull out floor covering (1) in area of C-pillar and remove
CAUTION: Do not damage electrical leads.
NOTE: Installation: Align floor covering at attachment points for seats and thread electric wires through corresponding cutouts
20
Install in the reverse order
Special Tools
Torx Bit Set P/N # 000 589 01 10 00