Topaz FWD L4-140 2.3L HSC (VIN X) (1989)
Figure 9
a.
Scribe the "B" pillar limit switch bracket as shown in Figure 8.
b.
Rework the top attaching hole into a 13.5 mm x 21.5 mm (0.5 x 0.8 in.) slot as shown in Figures 8 and 9.
CAUTION:
BE SURE TO KEEP ALL METAL PARTICLES AWAY FROM THE LIMIT SWITCH AREA AND THE REST OF THE TRACK
ASSEMBLY DURING THIS OPERATION.
Figure 9
c.
Install the existing "B" pillar limit switch to the new track assembly. Be sure the rubber limit switch bumper is installed correctly.
d.
Secure the switch wiring to the bracket assembly with a new adjustable bundling strap (95873-S). Be sure the lock of the strap is positioned
as shown in Figure 9.