mitsubishi Workshop Repair Guides

Mitsubishi Montero V6-38L SOHC Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 2036 > < Initial Inspection and Diagnostic Overview|Page 2034
Page 110
background image

STEP 13. Check the wiring harness between power window relay connector D-219 (terminal 1) and ETACS-ECU connector D-222 (terminal 8).

Q: Is the wiring harness between power window relay connector D-219 (terminal 1) and ETACS-ECU connector D-222 (terminal 8) in good condition?

YES: Replace the ETACS-ECU. Verify that the power windows function should now work normally. 

NO: The wiring harness may be damaged or the connector(s) may have loose, corroded or damaged terminals, or terminals pushed back in the
connector. Repair the wiring harness as necessary. Verify that the power windows function should now work normally.

Inspection Procedure D-2

Power Window: The power window timer does not work normally.

Power Window Timer Function Circuit

CIRCUIT OPERATION

The ETACS-ECU activates the power window timer function with input signals from the followings:

-

Ignition switch (IG1)

-

Front door switch

TECHNICAL DESCRIPTION (COMMENT)

If the power window timer function does not work normally, the circuit inputs, the ETACS-ECU or the front-ECU may be defective.

Initial Inspection and Diagnostic Overview|Page 2036 > < Initial Inspection and Diagnostic Overview|Page 2034