nissan Workshop Repair Guides

Nissan and Datsun Workshop Service and Repair Manuals

Engine Controls - CONSULTIII(R) ECM Programming|Page 5353 > < Engine Controls - CONSULTIII(R) ECM Programming
Page 2
background image

^ C-III PCMCIA Card Adapter is installed.

^ C-III Security Card is installed.

^ A screen print for Warranty documentation can be done from C-III during this process while still cable-connected to the vehicle.

1. Use the USB cable to connect the Vehicle Interface (VI) to the C-III computer and then connect the VI to the vehicle.

CAUTION

2. Connect the AC Adapter to the C-III computer.

CAUTION

3. Connect a battery charger to the vehicle battery:

For Conventional Vehicles

^ Set the battery charger at a low charge rate.

NOTE:

The GR-8 (Battery and Electrical Diagnostic Station) set to "Power Supply" mode is recommended.

CAUTION

For Hybrid Vehicles

^ Use the GR-8  Battery and Electrical Diagnostic Station.

^ If needed, refer to Hybrid Service TSBs for connecting the GR-8 to the Hybrid 12V battery.

Engine Controls - CONSULTIII(R) ECM Programming|Page 5353 > < Engine Controls - CONSULTIII(R) ECM Programming