Grand Prix V6-191 3.1L VIN M SFI (1998)
2. Install the DRL diode bracket to cross vehicle beam retaining bolt.
Tighten
Tighten the DRL diode bracket retaining bolt to 2 N.m (18 lb in).
3. Reach through the LH IP access opening and connect the electrical connector (1) to the DRL diode.
4. Install the LH IP access panel.
5. Install the steering column filler panel.
6. Install the LH IP insulator.