pontiac Workshop Repair Guides

Pontiac Workshop Service and Repair Manuals

Deployment Outside Vehicle - Steering Wheel Module, I/P Module, And Side Impact Module|Page 12755 > < Deployment Outside Vehicle - Steering Wheel Module, I/P Module, And Side Impact Module|Page 12753
Page 10
background image

34. Route the deployment harness out of the driver side of the vehicle.

35. Disconnect the I/P module yellow harness connector (2) above passenger side sound insulator.

36. Cut the yellow harness connector out of the vehicle, leaving at least 16 cm (6 in) of wire at the connector.

IMPORTANT:  If vehicle is equipped with dual stage air bags, the I/P module will each have 4 wires and standard air bags will only have 2 wires.
Refer to SIR Connector End Views for determining high and low circuits.

37. Strip 13 mm (0.5 in) of insulation from each of the connector wire leads.

38. Cut two 6.1 m (20 ft) deployment wires from a 0.8 mm (18 gage) or thicker multi-strand wire. These wires will be used to fabricate the passenger

deployment harness.

39. Strip 13 mm (0.5 in) of insulation from both ends of the wires cut in the previous step.
40. Twist together one end from each of the wires in order to short the wires.

41. Twist together the 2 connector wire leads of the high circuits from both stages of the I/P module to one of the deployment harness wires. Refer to

SIR Connector End Views in order to determine the correct circuits.

42. Ensure the 3-wire connection is secure.

Deployment Outside Vehicle - Steering Wheel Module, I/P Module, And Side Impact Module|Page 12755 > < Deployment Outside Vehicle - Steering Wheel Module, I/P Module, And Side Impact Module|Page 12753