911 Carrera (997) F6-3.6L (2006)
Initial tightening: 15 ftlb.; -> Final tightening - torque angle: 110°
15. Repeat steps 3-14 for the pistons/connecting rods on cylinders 2 and 3. For the assembly of cylinder 2, bore 'U5' will be fixed with the fixing pin
after the crankshaft is turned on the belt pulley/vibration balancer; for the assembly of cylinder 3, bore 'U6' will be fixed.
16. Remove the cylinder-head screw from crankcase 1-3 using the spacer sleeve 9613.
Only the following sealants may be used to seal the engine:
^
Loctite 5900
^
Drei Bond or Loctite 1209 (optional)
17. Prepare crankcase half 4-6 to fit it onto crankcase half 1-3. Carefully grease sealing faces of both halves with acetone. Align connecting rods 4-6
vertically upwards and fold timing chain.
Aligning timing chain and connecting rod
18. Apply sealant to the sealing face of crankcase half 4-6.
Application of sealant and tightening sequence for crankcase
19. With the help of a second person, place crankcase half 4-6 in position on crankcase half 1-3. Knock gently on crankcase half 4-6 using a plastic
hammer. Pull timing chain out through chain space using a bent welding wire.
20. Position four new, coated M6 x 35 Torx screws -1- on flywheel side.