porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 1417 > < Procedures|Page 1415
Page 20
background image

Additional screw for gear carrier, side 4-6

25. Tighten third star screw for crankcase half 4-6 on engine support.

Mount for crankcase half 4-6 on engine support

26. Remove belt pulley/vibration balancer.
27. Fit crankshaft sealing ring on belt pulley side.
28. Only position belt pulley/vibration balancer with fastening screw (to turn the crankshaft).
29. Check the position of the crankshaft using the measuring mandrel 9699/1.

Measuring mandrel 9699/1

30. Fit crankshaft sealing ring on flywheel side. Use the insertion device 9699 for the assembly.

Piston assembly, cylinder side 4-6:

31. Turn the crankcase at the assembly support so that cylinder bank 4-6 stands upwards.
32. Move crankshaft of cylinder 6 to TDC by turning it on the belt pulley/vibration balancer (in a clockwise direction). Bore U6 on the belt

pulley/vibration balancer must be aligned with the fixing bore on the crankcase. Fix the crankshaft using a fixing pin 9595/1.

33. Secure special tool centering aid 9602/5 to the crankcase using two countersunk crosshead screws.

Procedures|Page 1417 > < Procedures|Page 1415