porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Engine Controls - Performance Kit Installation|Page 1317 > < Engine Controls - Performance Kit Installation|Page 1315
Page 10
background image

1. Clean the sealing surfaces of the intake distributor and crankcase.

2. Replace the seals in the intake distributor and insert correctly into the grooves of the intake distributor.
3. Place intake distributor in installation position. At the same time, pull through and lay the vacuum lines to the switch-over valve.

INFORMATION:  If necessary, to ease installation of the intake distributor, insert the rear fastening screw in its bore in the intake distributor before
commencing installation.

The socket for tightening the fastening screws of the intake distributor should be secured with a strip of insulating tape to prevent them falling out.

If necessary, carry out the work using a small mirror.

4. Screw in and tighten fastening screws of the intake distributor, using a magnet if necessary - Tightening torque: 7.5 ftlb.
5. Lift engine into position with the car jack and fasten - Tightening torque: 63 ftlb.

6. Check sealing rings of injection valves and replace if necessary. Clean sealing surfaces with a lint-free cloth and apply a thin coat of silicone spray.

Insert fuel distributor pipe together with fitted injection valves into the appropriate openings of the intake distributor and screw in the fastening
screws of the fuel distributor pipe to the intake distributor -1-. Tighten screws - Tightening torque: 7.5 ftlb.

7. Move cable duct into position on the fuel distributor pipe and clip in.

Engine Controls - Performance Kit Installation|Page 1317 > < Engine Controls - Performance Kit Installation|Page 1315