porsche Workshop Repair Guides

Porsche Workshop Service and Repair Manuals

Procedures|Page 5059 > < Procedures|Page 5057
Page 3
background image

4.2. Press plastic bushings -1- into the bore on the outside and inside of roof frame 1 -4-.

NOTE:

Pins pressed in incorrectly

-

Plastic bushings can break

-

The pins must only be pressed in by hand.

4.3. Position roof frame 2 -2- and roof frame 3 -3- on roof frame 1 -4- and join them together with pins -5- and -6-. Use the retaining clip -7- to

secure pins -5- and -6-.

5. Install main folding top bow.

Procedures|Page 5059 > < Procedures|Page 5057