saab Workshop Repair Guides

Saab Workshop Service and Repair Manuals

Engine Oil Cooler Replacement|Page 1406 > < Engine Oil Cooler Replacement|Page 1404
Page 4
background image

1. Install new O-rings in place on the two pipe connections and install the heat exchanger in place.
2. Clean the heat exchanger cover using washing gasoline and apply (10) 81 52 381, or equivalent in the groove. Install the cover using a new gasket.

Tighten the bolts to 20 Nm (15 ft. lbs.) in a circular sequence, starting in the middle.

3. Install the two securing bolts for the heat exchanger. Connect the oil lines, but do not tighten the screws.

4. Install the bolt for the check valve bracket and fix the fastening between the oil lines.
5. Raise the car and install the oil lines to the cylinder block. Torque to 30 Nm (22 ft. lbs.).
6. Install the oil filter. Torque to 10 Nm (7.4 ft. lbs.).
7. Install the crankshaft position sensor. Lower the car.
8. Screw the oil lines to the heat exchanger and torque to 30 Nm (22 ft. lbs.).
9. Install the coolant bridge, using (10) 74 96 284, or equivalent on the bolts and torque to 30 Nm (22 ft. lbs.).

10. Apply acid-free Vaseline to the lower intake manifold and install it. See illustration for order. Lock the bolts using (10) 74 96 268, or equivalent

and torque to 20 Nm (15 ft. lbs.).

11. Install the center intake manifold with fuel rail. Lock the bolts using (10) 74 96 268, or equivalent and torque to 20 Nm (15 ft. lbs.).

Engine Oil Cooler Replacement|Page 1406 > < Engine Oil Cooler Replacement|Page 1404