saturn Workshop Repair Guides

Saturn Workshop Service and Repair Manuals

Sliding Door Swing Out Window Replacement|Page 14005 > < Sliding Door Swing Out Window Replacement
Page 2
background image

Notice:  Refer toFastener Notice    in Cautions and Notices.

2. Install the studs nuts to the swing-out window hinge.

Tighten the nuts to 10 Nm (89 lb in).

3. Install the swing-out window latch screws.

Tighten the screws to 10 Nm (89 lb in).

4. Press the plugs into the swing-out window access hole on the sliding door until fully seated.
5. Install the sliding door garnish molding. Refer toGarnish Molding Replacement - Sliding Door   (See: Interior Moulding / Trim/Trim

Panel/Service and Repair/Garnish Molding Replacement - Sliding Door) in Interior Trim.

Important:  By installing the 15A fuse, the low current logic power will be restored to both the LH and RH PSDMs and the PSDs will be
operational. However, both PSDMs will have to learn the full open and full closed positions of the PSD. Refer toAcutator Control Module
- Power Sliding Door (PSD) Programming and Setup  
  .

6. If equipped with a power sliding door, enable the PSD system by installing the PSD 15A fuse into the I/P fuse block.

Sliding Door Swing Out Window Replacement|Page 14005 > < Sliding Door Swing Out Window Replacement