VUE AWD V6-3.5L VIN 4 (2004)
4. Tighten the 2 brake pressure modulator assembly insulator nuts.
^
Tighten the nuts to 10 Nm (89 inch lbs.).
5. Connect the EBCM electrical connector.
6. Reposition the TCM, if equipped, to the mounting bracket.
4. Tighten the 2 brake pressure modulator assembly insulator nuts.
^
Tighten the nuts to 10 Nm (89 inch lbs.).
5. Connect the EBCM electrical connector.
6. Reposition the TCM, if equipped, to the mounting bracket.