VUE FWD L4-2.4L Hybrid (2007)
9. Install the generator control module bracket.
10. Install the generator control module bracket bolts and stud.
Tighten the bolts/stud to 10 N.m (89 lb in).
11. Install the battery hold down retainer (5).
12. Install the battery hold down bracket nuts (1, 4).
Tighten the nuts to 10 N.m (89 lb in).
13. Install the wiring harness relay block bracket (2) and nut (3).
Tighten the nut to 10 N.m (89 lb in).