saturn Workshop Repair Guides

Saturn Workshop Service and Repair Manuals

Hybrid Battery Fuse|Service and Repair|Page 4462 > < Hybrid Battery Fuse|Service and Repair|Page 4460
Page 13
background image

14. Install the positive battery cable bracket (2) to the stud.
15. Install the air conditioning compressor and condenser line nut (1) to the generator control module bracket stud.

Tighten the nut to 20 N.m (15 lb ft).

16. Install the forward lamp wiring harness electrical connector (1) to the positive battery cable bracket.

Hybrid Battery Fuse|Service and Repair|Page 4462 > < Hybrid Battery Fuse|Service and Repair|Page 4460