VUE FWD L4-2.4L Hybrid (2007)
14. Install the positive battery cable bracket (2) to the stud.
15. Install the air conditioning compressor and condenser line nut (1) to the generator control module bracket stud.
Tighten the nut to 20 N.m (15 lb ft).
16. Install the forward lamp wiring harness electrical connector (1) to the positive battery cable bracket.