VUE FWD L4-2.4L Hybrid (2007)
6. Position the generator starter with the generator control module 3-phase cables to the vehicle and install the bolts.
7. Tighten the generator starter bolts in the following sequence.
1. Front
2. Bottom
Tighten the bolts to 58 N.m (43 lb ft).
8. Place a NEW terminal block seal onto the generator control module.
9. Install the generator control module 3-phase cable terminal block to the generator control module.
10. Install the generator control module 3-phase cable terminal block nuts to the generator control module.
Tighten the nuts to 8 N.m (71 lb in).