xB L4-2.4L (2AZ-FE) (2009)
12. INSTALL COMBINATION METER ASSEMBLY See: Instrument Panel, Gauges and Warning Indicators/Instrument Cluster / Carrier/Service
and Repair/Combination Meter/Installation
13. INSTALL INSTRUMENT CLUSTER FINISH PANEL ASSEMBLY See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument
Panel/Service and Repair/Upper Instrument Panel/Installation
14. INSTALL INSTRUMENT CLUSTER FINISH LOWER PANEL See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument
Panel/Service and Repair/Upper Instrument Panel/Installation
15. INSTALL INSTRUMENT CLUSTER FINISH CENTER PANEL SUB-ASSEMBLY See: Body and Frame/Interior Moulding / Trim/Dashboard /
Instrument Panel/Service and Repair/Upper Instrument Panel/Installation
16. INSTALL FRONT PILLAR GARNISH LH See: Body and Frame/Interior Moulding / Trim/Headliner/Service and Repair/Installation
17. INSTALL FRONT PILLAR GARNISH RH See: Body and Frame/Interior Moulding / Trim/Headliner/Service and Repair/Installation
18. INSTALL FRONT DOOR OPENING TRIM WEATHERSTRIP LH See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument
Panel/Service and Repair/Upper Instrument Panel/Installation
19. INSTALL FRONT DOOR OPENING TRIM WEATHERSTRIP RH See: Body and Frame/Interior Moulding / Trim/Dashboard / Instrument
Panel/Service and Repair/Upper Instrument Panel/Installation
20. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 5.4 Nm (55 kgf-cm, 48 in-lbf)