–
| Tack weld service door hinge with four shielded-arc spot welds, recheck door alignment and adjust if necessary. |
–
| Fully weld in service door hinge and re-check door alignment. |
–
| Remove door, check weld seams and remove M6 bolt. |
–
| Weld hole in service door hinge. |
–
| Clean weld seams, remove residual deposits from grinding and priming, and apply primer (also on inner side of door). |
–
| Seal connection area of door hinge using adhesive sealant -D 511500 A2-. |
–
| Finish assembling front door. |
|
|
|