–
| Cut the cable ties fastening the cables to the fresh air turbine housing -C- |
–
| Release the block -B- and rotate the fresh air turbine housing -C- in -direction of the arrow-. |
Note t
| The join between the fresh air turbine housing -C- and the climate control system may be sealed with sealing paste, in which case it will be necessary to rotate the housing with more force. |
|
|
|