t
| The Climatronic control unit -J255-/Air conditioning control unit -J301- sends a signal along the comfort data bus to the engine control unit, depending on the pressure calculated in the refrigeration circuit, while the compressor is activated, to request a higher refrigerant ventilator speed. The request calculated by the Climatronic control unit -J255-/Air conditioning control unit -J301- is displayed on the measurement values block → Vehicle diagnosis, testing and information system VAS 5051. |
t
| Currently, the request for a higher refrigerant ventilation speed is sent for the following duty cycle: |
t
| Pressure in refrigerant circuit in bar lower than 9 bar (6 bar if the pressure was above 9 bar) - no request. |
t
| Pressure in refrigerant circuit in bar higher than 9 bar (6 bar) up to about 20 bar, depending on the pressure - request 30 % to 100%. |
t
| Pressure in refrigerant circuit in bar higher than 20 bar - request 100 %. |
t
| The signal generated by the High pressure sender -G65- may also be used for engine management. The control and indication panel Climatronic control unit -J255-/Air conditioning control unit -J301- sends the information over the comfort system data bus to the engine control unit (the torque required for compressor operation depends on the pressure in the refrigeration circuit). Depending on engine control unit version, the signal is displayed as duty cycle in measurement value block → Vehicle diagnosis, testing and information system VAS 5051 |
|
|
|