–
| Fit adaptor -V.A.G 1318/11- and -V.A.G 1318/23- to the pressure gauge and place the end of the pressure regulator in a measuring container. |
–
| Close pressure gauge cut-off tap (lever at right angle to direction of flow -B-). |
–
| Operate remote control at short intervals until a pressure of 3 bar has built up. |
Caution Danger of spray when opening the shut-off tap, hold container over the pressure gauge free connection. |
|
–
| If pressure builds up too high, lower excess pressure by carefully opening the shut-off tap. |
–
| Observe pressure drop on gauge. After 10 minutes the pressure must not drop below 2.5 bar. |
If the pressure drops further: |
–
| Check pipe connections for leaks. |
|
|
|