Baja F4-2.5L SOHC (2003)
6. Insert canister hoses approximately 25 to 30 mm (0.98 to 1.18 in) into the lower end of evaporation pipe assembly and tighten clamp.
L = 27.5 ± 2.5 mm (1.083 ± 0.098 in)
7. Tighten bolt which holds evaporation pipe assembly on body.
Tightening torque: 7.5 N.m (0.75 kgf-m, 5.4 ft-lb)
8. Insert air vent hose (A), evaporation hose (P) approximately 25 to 30 mm (0.98 to 1.18 in) into the lower end of evaporation pipe assembly and
hold clip.