XT-6 2WD L6-2.7L SOHC (1989)
-
Align the center of three lines scribed on flywheel with timing mark on flywheel housing.
-
Align timing mark on camshaft sprocket LH with notch in belt cover.
-
Install timing belt from the crankshaft side. Be careful not to loosen it.
-
Install left tensioner. Check that it moves smoothly after installation.
Tightening torque: 39 - 47 N-m (4.0 - 4.8 kg-m, 29 - 35 ft-lb)