suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Lamps and Indicators - Engine > < Intake Manifold|Specifications|Page 1311
Page 3
background image

4. Install intake manifold front stiffener (1). Tighten bolts to specified torque.

Tightening torque
Intake manifold front stiffener bolt a: 55 N.m (5.5 kg-m, 40.0 lb-ft)

5. Connect the following hoses:
-

Brake booster hose (2) to intake manifold

-

PCV hose (3) to PCV valve

-

Fuel pressure regulator vacuum hose (4) to intake manifold

-

Coolant hoses (5) to throttle body

-

Breather hose (6) to throttle body

-

Vacuum hose (7) to EVAP canister purge valve

6. Connect the following electric lead wires:
-

IAC valve (8)

-

TP sensor (9)

-

EGR valve (10)

-

EVAP canister purge valve (11)

-

MAP sensor (12)

-

Ground terminal (13) to throttle body

7. Connect accelerator cable (14) to throttle valve lever (15) and install its bracket (16) to intake manifold.

Adjust accelerator cable play.

8. Install air cleaner outlet hose.
9. Install engine cover.

10. Check to ensure that all removed parts are back in place.

Reinstall any necessary parts which have not been reinstalled.

11. Refill cooling system.
12. Connect negative cable at battery.
13. Start engine and check for engine coolant leaks.

Lamps and Indicators - Engine > < Intake Manifold|Specifications|Page 1311