suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

With Advanced Air Bag|Page 4302 > < With Advanced Air Bag|Page 4300
Page 10
background image

(C): 09932-75410

6. Short two deployment harness leads (1) together by fully seating one banana plug into the other.

WARNING:  Deployment harness (A) shall remain shorted and not be connected to 12 volts vehicle battery until you are ready to deploy 
air bag (inflator) module or activate seat belt pretensioner.

7. Connect adapter cable (B) in series with deployment harness (A) to air bag (inflator) module or seat belt pretensioner as follows.

a. For air bag (inflator) module

Connect adapter cable (B) in series with deployment harness (A) and push adapter cable (B) connector to air bag (inflator) module connector
(driver or passenger) till click can be heard.

b. For seat belt pretensioner

Connect adapter cable (B) in series with deployment harness (A) to seat belt pretensioner and lock connector with lock part.

With Advanced Air Bag|Page 4302 > < With Advanced Air Bag|Page 4300