Grand Vitara LTD 2WD V6-2.5L (2001)
7. Connect connectors of EVAP canister purge valve and EGR valve.
Fix wire harness with clamps.
8. Install clamp bracket to intake collector.
9. Connect ground terminal to intake manifold.
10. Connect connectors of TP sensor, MAF sensor and IAC valve.
11. Connect connector of injector wire.
12. Install surge tank pipe to intake manifold with new gaskets and intake air pipe to throttle body. Install surge tank cover.
13. Connect engine coolant hoses to throttle body.
14. Connect accelerator cable and A/T throttle cable (A/T).
15. Install strut tower bar (1) and tighten bolts.
16. Refill cooling system.
17. Connect negative (-) cable at battery.
18. Adjust accelerator cable and A/T throttle cable, refer to "ACCELERATOR CABLE ADJUSTMENT" and "A/T THROTTLE CABLE
ADJUSTMENT".