Verona L6-2.5L (2005)
3. Install the high-pressure pipe-to-receiver-dryer connecting block nut.
Tighten:
Tighten the high-pressure pipe-to-receiver-dryer connecting block nut to 14 N.m (10 lb.ft).
4. Install the high-pressure pipe to-evaporator flauge connecting block retaining nut.
Tighten:
Tighten the high-pressure pipe-to-evaporator flauge connecting block retaining nut to 15 N.m (11 lb.ft).
5. Install the nut at the condenser connecting block.
Tighten:
Tighten the condenser connecting block nut to 16 N.m (12 lb.ft).