suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Intake Manifold|Specifications|Page 989 > < Intake Manifold|Specifications|Page 987
Page 5
background image

6. Connect hoses of heater (1), EVAP canister (4), fuel feed (2) and fuel return (3).
7. Install EGR pipe (3) with new gaskets. 
8. Connect hoses of EVAP canister purge valve (4) and heater (5). 
9. Connect hoses of PCV (6), breather (8) and water (7).

10. Connect couplers of manifold absolute pressure (MAP) sensor, EVAP canister purge valve (1), EGR valve (2) and earth terminal (9). 

Fix wire harness with clamps.

11. Install clamp bracket (4) to intake collector. 
12. Connect earth terminal (3) to intake collector. 

13. Connect couplers of TP sensor (1) and IAC valve (2).
14. Connect brake booster hose (2) to intake manifold. 

15. Connect injector wire (1) coupler.
16. Connect water hoses (3) to throttle body.

Intake Manifold|Specifications|Page 989 > < Intake Manifold|Specifications|Page 987