toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Timing Chain|Specifications|Page 1513 > < Timing Chain|Specifications|Page 1511
Page 12
background image

e. Install the engine lateral control rod with the bolt (M/T). 

Torque: 89 Nm (910 kgf-cm, 69 (inch lbs.) 

45. INSTALL OIL PAN SUB-ASSY

NOTICE:   
-

Remove any oil from the contact surface.

-

Install the oil pan within 3 minutes after applying seal packing.

-

Do not start the engine 2 hours after installing.

a. Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surface of the cylinder block and oil pan.
b. Apply seal packing in the shape of bead (Diameter 3 - 4 mm (0.157 inch)) as shown in the illustration, and install the oil pan. 

Seal packing: Part No. 08826-00080 or equivalent

c. Install the oil pan with the 12 bolts and 2 nuts. 

Torque: 9.0 Nm (92 kgf-cm, 80 inch lbs.) 

46. INSTALL CHAIN TENSIONER ASSY NO.1)

47. INSTALL CRANK POSITION SENSOR

Timing Chain|Specifications|Page 1513 > < Timing Chain|Specifications|Page 1511