toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Sensors and Switches - Steering > < Power Steering Pump|Removal and Installation|Page 6595
Page 7
background image

11. INSTALL SPRING, FLOW CONTROL VALVE AND PRESSURE PORT UNION

a. Install the valve facing the correct direction. 
b. Coat a new O-ring with power steering fluid and install it to the union.
c. Torque the union.

5S-FE and 1MZ-FE Engines: 

Torque: 83 Nm (850 kgf-cm, 62 ft. lbs.)

12. INSTALL SUCTION PORT UNION

a. Coat a new O-ring with power steering fluid and install it to the union.
b. Torque the bolt.

5S-FE and 1MZ-FE Engines: 

Torque: 13 Nm (130 kgf-cm, 9 ft. lbs.)

13. INSTALL FRONT AND REAR BRACKETS

Torque the 3 bolts and 2 nuts.

5S-FE and 1MZ-FE Engines: 

Torque: 43 Nm (440 kgf-cm, 32 ft. lbs.)

14. INSTALL VANE PUMP PULLEY

Using Special Service Tool (SST) to stop the pulley rotating, torque the nut.
(SST) 09960-10010 (09962-01000, 09963-01000)

5S-FE and 1MZ-FE Engines: 

Torque: 43 Nm (440 kgf-cm, 32 ft. lbs.)

15. MEASURE POWER STEERING (PS) VANE PUMP ROTATING TORQUE

Sensors and Switches - Steering > < Power Steering Pump|Removal and Installation|Page 6595