toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Timing Chain|Removal|Page 1143 > < Timing Chain|Removal|Page 1141
Page 9
background image

(e) Using a Torx(R) wench socket (E8), install the stud bolt.

Torque: 9.3 Nm (95 kgf-cm, 82 in.-lbf) 

8. 2ZZ-GE: INSTALL TIMING CHAIN COVER AND WATER PUMP

(a) Remove any old packing (FIPG) material and be careful not to drop any oil on the contact surfaces of the timing chain cover, cylinder head

and cylinder block.
-

Using a razor blade and a gasket scraper, remove all the old packing (FIPG) material from the gasket surfaces and sealing grooves.

-

Thoroughly clean all components to remove all the loose material.

-

Using a non-residue solvent, clean both sealing surfaces.

(b) Apply seal packing to the timing chain cover as shown in the illustration.

Seal packing:
Part No.08826-00100 or equivalent
-

Install a nozzle that has been cut to a 1.5 mm opening.

HINT:  Avoid applying an excessive amount to the surface.
-

Parts must be assembled within 3 minutes of application. Otherwise the material must be removed and reapplied.

-

Immediately remove nozzle from the tube and reinstall cap.

(c) Install the 2 gasket to the timing chain cover as shown in the illustration.

(d) Apply seal packing to 4 locations as shown in the illustration.

Seal packing:
Part No.08826-00080 or equivalent
-

Install a nozzle that has been cut to a 4-5 mm (0.16-0.20 in.) opening.

HINT:  Avoid applying an excessive amount to the surface.
-

Parts must be assembled within 3 minutes of application. Otherwise the material must be removed and reapplied.

Timing Chain|Removal|Page 1143 > < Timing Chain|Removal|Page 1141