toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Timing Chain|Diagrams|Page 1431 > < Timing Chain|Diagrams|Page 1429
Page 19
background image

b. Apply seal packing to 2 locations as shown in the illustration.

Seal packing: Part No. 08826-00080 or equivalent

c. Install the gasket to the cylinder head cover. 

HINT:  Part must be assembled within 3 minutes of application. Otherwise the material must be remove and reapplied.

d. Install the cylinder head cover with the 9 bolts, 2 seal washers and 2 nuts.

Uniformly tighten the bolts and nuts, in the several passes, in the sequence shown.
Torque:

w/o washer: 11 Nm (113 kgf-cm, 8 ft. lbs.)
w/ washer: 9.0 Nm (92 kgf-cm, 80 inch lbs.)

e. Connect the 2 PCV hoses to the cylinder head cover.
f.

Install the ignition coil.

18. 2ZZ-GE: INSTALL CYLINDER HEAD COVER

a. Remove any old packing (FIPG) material.

HINT:  When FIPG on the head cover gasket side cannot be eliminated completely, replace the gasket.

b. Apply seal packing to 2 locations as shown in the illustration.

Seal packing: Part No. 08826-00080 or equivalent

c. Install the gasket to the cylinder head cover.

HINT:  Part must be assembled within 3 minutes of application. Otherwise the material must be remove and reapplied.

Timing Chain|Diagrams|Page 1431 > < Timing Chain|Diagrams|Page 1429