Celica GT-S L4-1.8L (2ZZ-GE) (2000)
d. Install the cylinder head cover and wire harness protector with the bolts. Uniformly tighten the bolts, in the several passes, in the sequence
shown.
Torque: 10 Nm (100 kgf-cm, 7 ft. lbs.)
e. Connect the 2 PCV hoses to the cylinder head cover.
f.
Install a new gasket and No.1 ventilation pipe with 2 nuts and bolt.
Torque:
Nut: 10 Nm (100 kgf-cm, 7 ft. lbs.)
Bolt: 25 Nm (255 kgf-cm, 18 ft. lbs.)
g. Connect the No. 3 ventilation hose to the No.1 ventilation pipe.
h. Install the ignition coil.
19. INSTALL RIGHT-HAND ENGINE MOUNTING INSULATOR
a. 1ZZ-FE: Install the Right-Hand engine mounting insulator with the 4 bolts and 2 nuts.
Torque: 52 Nm (530 kgf-cm, 38 ft. lbs.)
b. 2ZZ-GE: Install the Right-Hand engine mounting insulator with the 5 bolts and 2 nuts.
Torque: 52 Nm (530 kgf-cm, 38 ft. lbs.)
20. INSTALL PS PUMP
a. Install the PS pump with the 2 through bolts and nuts.
Torque: 36 Nm (370 kgf-cm, 27 ft. lbs.)
b. Install the PS pump pulley with the pulley nut.
c. Connect the PS oil pressure switch connector.
21. INSTALL GENERATOR AND DRIVE BELT
22. INSTALL RIGHT-HAND ENGINE UNDER COVER
23. INSTALL RIGHT-HAND FRONT WHEEL
24. FILL WITH ENGINE COOLANT
25. INSTALL FRONT FENDER APRON SEAL AND UPPER RADIATOR SUPPORT SEAL
26. START ENGINE AND CHECK FOR COOLANT LEAKS