toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 3204 > < Initial Inspection and Diagnostic Overview|Page 3202
Page 4
background image

*

Turn the power switch off before measuring the resistances between CAN bus main wires and between CAN bus branch wires.

*

Turn the power switch off before inspecting CAN bus wires for a ground short.

*

After the power switch is turned off, check that the key reminder warning system and light reminder warning system are not
operating.

*

Before measuring the resistance, leave the vehicle as is for at least 1 minute and do not operate the power switch, any other
switches or the doors. If any doors need to be opened in order to check connectors, open the doors and leave them open.

HINT
*

Operating the power switch, any other switches or a door triggers related ECU and sensor communication on the CAN. This
communication will cause the resistance value to change.

*

Even after DTCs are cleared, if a DTC is stored again after driving the vehicle for a while, the malfunction may be occurring due
to vibration of the vehicle. In such a case, wiggling the ECUs or wire harness while performing the inspection below may help
determine the cause of the malfunction.

PROCEDURE

1. CHECK CAN BUS WIRE FOR DISCONNECTION (CERTIFICATION ECU BRANCH WIRE)

(a) Turn the power switch off.

(b) Disconnect the certification ECU connector.

Text in Illustration

(c) Measure the resistance according to the value(s) in the table below.

Standard Resistance:

NG --  REPAIR OR REPLACE CAN BUS MAIN WIRE OR CONNECTOR (CERTIFICATION ECU BRANCH WIRE)
OK -- Continue to next step.

2. CHECK HARNESS AND CONNECTOR (POWER SOURCE TERMINAL)

(a) Measure the voltage according to the value(s) in the table below.

Standard Voltage:

Initial Inspection and Diagnostic Overview|Page 3204 > < Initial Inspection and Diagnostic Overview|Page 3202