Sequoia 4WD V8-4.6L (1UR-FE) (2010)
(b) Install the 6 screws.
(c) Attach the 3 claws and install the heater clamp.
(d) Install a new packing, as shown in the illustration.
4. INSTALL AIR CONDITIONING AMPLIFIER ASSEMBLY See: Housing Assembly HVAC/Service and Repair/Overhaul/Front Air
Conditioning Unit/Reassembly
5. INSTALL NO. 2 AIR DUCT SUB-ASSEMBLY See: Housing Assembly HVAC/Service and Repair/Overhaul/Front Air Conditioning
Unit/Reassembly
6. INSTALL LOWER DEFROSTER NOZZLE ASSEMBLY See: Housing Assembly HVAC/Service and Repair/Overhaul/Front Air Conditioning
Unit/Reassembly
7. INSTALL FRONT AIR CONDITIONING UNIT
(a) Install the front air conditioning unit See: Housing Assembly HVAC/Service and Repair/Removal and Replacement/Front Air Conditioning
Unit/Installation.