Sequoia 4WD V8-4.7L (2UZ-FE) (2006)
1. INSPECT PROPELLER SHAFT AND INTERMEDIATE SHAFT FOR DAMAGE OR RUNOUT
a. Using a dial indicator, check the runout of each shaft.
Maximum runout: 0.8 mm (0.031 inch)
If shaft runout is greater than the maximum, replace the shaft.
2. INSPECT SPIDER BEARING
a. Inspect the spider bearing for wear or damage.
b. Using a dial indicator, check the spider bearing axial play by turning the yoke of flange while holding the shaft tightly
Maximum bearing axial play: 0.05 mm (0.0020 inch)
If the spider bearing axial play exceeds the maximum, replace the spider bearing.
3. INSPECT PROPELLER SHAFT GREASE FITTING DIRECTION
HINT: When replacing a spider bearing, be sure that the grease fitting hole is facing the direction shown in the illustration.
REASSEMBLY
1. INSTALL SPIDER BEARING