toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Crankshaft Gear/Sprocket|Removal|Page 2121 > < Crankshaft Gear/Sprocket|Removal|Page 2119
Page 4
background image

(c) Using variable pin wrench SST No. 09962-01000, or equivalent, tighten the pulley bolts to 79 Nm (810 kg. cm., 59 ft. lbs.). 

9. Set No.1 cylinder to TDC/compression as follows:

(a) Turn the crankshaft pulley, and align its groove with timing mark -0- of the No.1 timing belt cover.

NOTE:  Always turn the crankshaft clockwise.

(b) Using SST variable pin wrench, align the timing marks of the camshaft timing pulleys and No.4 timing belt cover.

10. Install timing belt to camshaft pulleys as follows:

NOTE: When re-using timing belt, align the matchmarks of the timing belt and camshaft timing pulleys made at disassembly.

(a) Remove any oil or water on the camshaft timing pulley, and keep it clean.
(b) Install the timing belt, checking the tension between the crankshaft timing pulley and exhaust camshaft timing pulley.

11. Pre-set timing belt tensioner for installation as follows:

Crankshaft Gear/Sprocket|Removal|Page 2121 > < Crankshaft Gear/Sprocket|Removal|Page 2119