toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Air Injection Control Valve|Service and Repair|Page 2272 > < Air Injection Control Valve|Service and Repair|Page 2270
Page 3
background image

c. Connect the air switching valve connector.
d. Connect the vacuum hose.

9. INSTALL INTAKE PIPE INSULATOR

a. Install 2 new gaskets onto the cylinder head and air switching valve.
b. Install the intake pipe insulator with the 4 nuts.

Torque: 20 N.m (204 Kgf.cm, 15 ft.lbf) 

10. CONNECT AIR INJECTION SYSTEM NO.1 HOSE

a. Connect the air injection system No.1 hose to the air switching valve.

11. INSTALL EXHAUST MANIFOLD HEAT INSULATOR NO.1

Air Injection Control Valve|Service and Repair|Page 2272 > < Air Injection Control Valve|Service and Repair|Page 2270