Install, Connect
Connect wiring harness plugs to tank vent valve and throttle valve potentiometer.
Fasten ground connections to fuel distributor pipe. Place plug strip on injectors and engage - ensure correct seating.
Attach engine vent hoses to cylinder head cover.
Attach fuel lines to fuel distributor pipe or fuel pressure regulator.
Attach accelerator Bowden cable to curved disc.
Attach intake manifold support to cylinder block and intake manifold - accessible from underside of vehicle - 25 Nm/18 lbf. ft.
Version with AC: connect vacuum line to intermediate piece for brake servo connection.
Attach brake servo vacuum line to intake manifold - 20 Nm/15 lbf. ft.
Connect coolant hose (1) to coolant compensation tank and to intake manifold.
Install, Connect
C 20 XE from MY '93: Attach support and shackle to generator or intake manifold - tightening torque 20 Nm. Tighten lower generator extract - tightening torque 35 Nm. Tighten ribbed V-belt tension roller clockwise using KM-913-A and attach ribbed V-belt, noting direction of rotation and installation position of ribbed V-belt.
C 20 XE up to MY '93: attach tension shackle to intake manifold. Install V-belt and tension - see operation "V-belt Tension, Check".
Install prevolume chamber with air intake hose. Attach hose to prevolume chamber.
Connect wiring harness plug to mass air flow meter and wiring harness plug to intake air temperature sensor.
Air cleaner housing - see operation "Air Cleaner Housing, Remove and Install".
Inspect
Cooling system - see operations "Cooling System, Top Up and Bleed" and "Cooling System, Check for Leaks".