Turbocharger Assemble
1. |
Install the NEW quick fitting
connector (2) and a NEW seal ring (1) to the turbocharger and
tighten to 20 N·m (15 lb ft) . |
2. |
Inspect the turbocharger
coolant pipes for ridges and damage. |
3. |
Install the turbocharger
coolant feed pipe (1) to the quick fitting connector (2) by pushing
in direction of the arrow until an audible click is heard.
|
4. |
Use the same procedure for the
turbocharger coolant return pipe and the turbocharger coolant
return pipe quick fitting connector. |
5. |
Install the turbocharger oil
return pipe (1) and a NEW sealing (3) to the turbocharger.
|
6. |
Install the 2 turbocharger oil
return pipe bolts (2) and tighten to 8 N·m (71 lb
in) . |
|