Push
cable guide in until centre of guide bolt aligns with adjustment notch.
1 Lever
caught in recess
2 Guide
bolt
3 Adjustment
notch
Place
plug on end of roof guide.
Adjust
crank drive - see operation "Crank Drive, Adjust" - and install.
Install
gutter - see operation "Gutter, Replace".
Install
operating unit - see operation "Operating Unit, Replace".
|