Fuel
Injection Quantity, Check and Adjust
Conditions:
Float
chamber must be at normal level during measurement, i.e. fuel must flow.
Injection
must begin immediately throttle valve is actuated.
Use
carburettor checking equipment.
Turn
cam plate (4) as shown in illustration D 0962 and hold in a position in which
the adjusting screw (3) does not rest on it. Open and close throttle valve
fully and evenly 10 times (approx. 1 sec./stroke). Pause for approximately 3
seconds between each stroke.
Divide
fuel quantity by 10 and compare with nominal value given in Technical Data.
|