Attach coolant flange to cylinder head with new gasket –
tightening torque 15 Nm / 11 lbf. ft.
Attach coolant hoses (1) and (2) to coolant flange –
ensure correct seating.
Attach support and shackle to intake manifold and alternator
– tightening torque 20 Nm / 15 lbf. ft.
Fasten lower alternator fastening bolt – tightening torque
35 Nm / 26 lbf. ft.
Install ribbed V-belt – see operation "Ribbed V-belt,
Remove and Install".
Connect ground cable to battery.
Close coolant drain bolt on radiator.
Top up cooling system – see operations "Cooling System,
Top Up and Bleed" and "Cooling System, Check for Leaks".
|